Expanding storage capacity does not always mean moving to a larger site. Installing a double mezzanine is a practical way to multiply usable area quickly and affordably. Stofix Technical Services produces solutions that fit in the available buildings and operational requirements.
Why Choose a Double Mezzanine for Your Warehouse?
A double mezzanine is a smart way to increase warehouse space without relocating. It includes an additional storage level for operations, enhances the work process, and serves a better usage of the vertical space.
Key advantages:
- Quick setup with reduced downtime.
- The higher the storage density, the better the picking efficiency.
- Savings of costs relative to the new location or development.
Key Factors When Planning Mezzanine Floors
Successful mezzanine floors depend on careful planning and coordination with structural engineers. We ensure that we are in compliance with the local building codes and layouts of pallet racking, forklifts, and safety barriers.
Important design points:
- Floor loading and column placement
- Staircases, handrails, and emergency exits
- Lighting, sprinklers, and material handling integration.
Benefits Of A Double-Decker Mezzanine Floor
A double-decker mezzanine floor adds two working levels where only one existed, ideal for e-commerce, archive storage, or light assembly. We provide stable platforms, adjustable footsteps, and expandable designs that can be expanded along with your business.
Operational Benefits
- Picking, packing, and storage areas are segregated.
- Rapid inventory turnover and more visibility of inventory.
- During and post-implementation.
We handle the entire process from concept to commissioning. These services are site survey, design drawing, fabrication, installation, and post-installation maintenance. The ability to create fabrics that are customized will give you customized metalwork that suits your warehouse.
Why our approach works
- Single-point responsibility from Stofix
- On-time delivery and quality workmanship.
- Maintenance and after-sales contracts.
Final Thoughts
Choosing mezzanine floors is a strategic, cost-effective way to expand capacity without relocation. Stofix provides designed, secure, and scalable solutions that enable companies to maximize the available footprint.
FAQs
Q: How long does installation take for a double-decker mezzanine floor?
Installation depends on the size and complexity, and is normally from a couple of days on small projects to several weeks on the larger projects of double-decker floors.
Q: Are mezzanines able to sustain heavy pallet racking?
Yes, mezzanine floors are engineered for heavy loads with properly designed support columns, bracing, and certifications for safe warehouse operations.
Q: What should be the after-maintenance of the mezzanine?
Mezzanines are maintained by regular checkups, load, and surface treatment. Stofix also provides maintenance contracts and periodic safety audits as a long-term, reliable feature.
Q: How much space can I gain with a double mezzanine?
A well-designed double mezzanine can double usable floor area, depending on ceiling height and layout, without moving to a new building.
Q: Will mezzanine floors require special permits?
Yes, building permissions and fire safety must be done locally. Stofix coordinates with the engineers and authorities to ensure total compliance with law and structure.